Riviera
Riviera Home Search Movies TV Shows People Trending Episodes
The Tunnel
The Tunnel

The Wayland House - 8 (S13E08)

S13E08

The master carpenter finishes the curved frame for the front portico deck, while the general contractor inspects the newly installed engineered wood framing for both the kitchen and the master bath. Meanwhile, excavator Herb Brockert starts digging the leaching field for the new septic system, and asbestos is being safely removed from the pipes in the basement.

Show The Tunnel
Episode S13E08
Air Date Oct 24, 1991