Riviera
Riviera Home Search Movies TV Shows People Trending Episodes
The Tunnel
The Tunnel

Weston; The Weston Timberframe Complete (S30E16)

S30E16

In Weston, landscape contractor Roger Cook puts the final touches on the yard, laying down new sod, constructing a bocce court, and setting up a modern irrigation system. Meanwhile, master carpenter Norm Abram and general contractor Tom Silva examine how their selections of lighting, hardware, and wood finishes enhance the barn-inspired aesthetic. They assist Roger in placing a rustic granite hearthstone for the fireplace. In the master bathroom, tile contractor Mark Ferrante finishes installing the last pieces of custom tile on the cast concrete vanity sinks. Lastly, the security system and industrial light fixtures are finalized, and the distinctive "harvest table," designed by architect Chris Adams, arrives for the dining room.

Show The Tunnel
Episode S30E16
Air Date Jan 14, 2009